Landfill Permits and Rates

A permit is required to enter the landfill for both waste disposal and recycling. 

  • Residential permits are available free, at the landfill.
  • Commercial permits are available at the City Clerks Office, 1st Floor, City Hall

All permits are valid for 2 years on a fiscal year basis (July 1 - June 30)

Residents of Bath and owners of property in Bath can get a resident sticker by showing a picture identification and one of these:

  • Utility bill showing the name and address in Bath
  • Vehicle registration showing the name and address in Bath
  • City property tax bill showing name and address in Bath
  • Residents of other towns can get a non-resident sticker by showing a picture identification

Contractors, Commercial haulers, and businesses can get a commercial permit by paying the appropriate fee:

Commercial Disposal (Type 2A) $75 per truck annually
Contractor (Type 2B1) $45 annually
Business (Type 3) $25 annually
Single Project (Type 2B2) $25 per project

Rates

Please call the landfill (207-443-8356) ahead of time if you have questions about rates for items not listed below.

Resident Fee's:

Type Cost
DEMO $115.00/ton
METAL $75.00/ton
BRUSH $20.00/ton
SHINGLES $85.00/ton
RECYCLE BIN $10.00 per bin

Non-Resident Fee's

Type Cost
DEMO $115.00/ton
METAL $95.00/ton
BRUSH $70.00/ton
SHINGLES $90.00/ton
LEAVES $20.00/ton

Fee's for Both Residents and Non-Residents

Type Cost
TV, Computer Monitor $10.00 apiece
Computer Tower $3.00 apiece
Mouse, Keyboard $2.00 apiece
Couch, Mattress, Boxspring, Stuffed Chair $10.00 apiece
Tire $5.00 apiece
Tire with Rim $7.00 apiece
Truck Tire $10.00 apiece
Heavy Equipment Tire $0.15/lb, $25.00 minimum
Car Battery $5.00 apiece
20lb Propane Tank $2.00 apiece
Over 20lb Propane Tank $21.00 apiece
Helium Tank $5.00 apiece
Fire Extinguisher $5.00 apiece
PCB Ballast $7.00 apiece
Mercury Thermometer/Thermostat $1.00 apiece
Mixed Load $300.00/ton
450 Oak Grove Avenue
Bath,
ME
04530
Fax: 207-443-8352

Monday - Friday
Office: 6:30 AM - 2:30 PM, Landfill: 7:30 AM - 4:00 PM
Director of Public Works
Lee Leiner, P.E.
Deputy Director of Public Works
Chris Wallace
Foreman
Jacob Dodge
Administrative Assistant
Michael Tucker