June 23, 2017

Construction update (June 23, 2017):

Contractor is installing geogrid and impermeable base layer

Residents should expect tractor trailer truck trips after July 10. These trucks will be delivering rolls of fabric. Each truck will make one trip in, deliver the materials and leave the site. There will be no “back and forth” trucking and the materials are not dust-generating. 

There will also be dump trucks delivering sand from a source in Durham over the next couple of weeks.

All trucks have been warned of speed limits and the presence of pedestrians.